Momik automates lighting design in Revit. Fully ECP 215 compliant. Weeks of work in minutes.
What takes weeks manually, Momik does in minutes. Fully automated lighting layout in Revit.
Every design meets ECP 215 requirements automatically. No manual norm-checking needed.
Works directly inside Autodesk Revit. No exports, no external tools, no workflow disruption.
AI-powered clash detection ensures every fixture placement is structurally valid from the start.
Reference lux levels, uniformity ratios, UGR limits, and colour rendering requirements per room type under ECP 215.
| Room / Task Type | Illuminance (Em) | Uniformity (Uo) | Glare (UGR) | Colour (Ra) |
|---|---|---|---|---|
| Open-plan office | 500 lx | ≥ 0.60 | ≤ 19 | ≥ 80 |
| Meeting / conference room | 500 lx | ≥ 0.60 | ≤ 19 | ≥ 80 |
| Reception / lobby | 300 lx | ≥ 0.40 | ≤ 22 | ≥ 80 |
| Corridor / circulation | 100 lx | ≥ 0.40 | ≤ 28 | ≥ 40 |
| Staircase | 150 lx | ≥ 0.40 | — | ≥ 40 |
| Toilet / WC | 200 lx | ≥ 0.40 | ≤ 25 | ≥ 80 |
| Warehouse (general) | 200 lx | ≥ 0.40 | ≤ 25 | ≥ 60 |
| Manufacturing (med. prec.) | 500 lx | ≥ 0.60 | ≤ 19 | ≥ 80 |
In Egypt, ECP 215 is referenced within the national building code and occupational safety regulations. National Quality Institute (NQI) / Ministry of Housing oversees compliance as part of the building permit and occupancy permit process. Commercial developments — particularly in regulated zones — face rigorous lighting compliance verification before receiving occupancy certificates. Lighting design documentation referencing ECP 215 is required for all major commercial and industrial project submissions.
Primary industries where ECP 215 compliance is most frequently required in Egypt.
Yes. In Egypt, ECP 215 is incorporated into the national building code and referenced by National Quality Institute (NQI) / Ministry of Housing. All major commercial and industrial construction requires lighting design documentation demonstrating norm compliance as part of the permit and occupancy approval process. Projects in regulated zones face particularly stringent verification.
National Quality Institute (NQI) / Ministry of Housing oversees compliance verification as part of the building inspection and occupancy permit process. Lighting design drawings and calculations referencing ECP 215 are required documentation for permit submissions. For projects financed through international or institutional investors, third-party compliance verification is increasingly standard practice.
Momik reads your Revit model room by room, automatically applies ECP 215 illuminance targets for each space type, calculates the correct fixture placement, quantity, and layout, and generates a fully compliant lighting design — entirely within Revit. No manual lux calculations, no spreadsheets, no cross-referencing the norm tables. Typical projects are completed in under five minutes.